EN Energy Gas Generator Sets applications
Natural gas power generation application scenarios in the drilling, production and transportation stage of oil and gas fields: drilling (offshore platform, land platform, isolated power grid or grid connection); mining (offshore and onshore oil and gas mining, isolated power grid/grid connection, CNG/LNG production, scattered gas power generation); gathering and transportation (power/power demand: large-scale use of power equipment such as oil pumps, natural gas booster transportation); pipeline transportation (crude oil and natural gas long-distance pipeline transportation, increased pressure energy)
Biological energy application scenario: food waste biogas power station power generation
Building application scenario: power generation through gas generator sets to supply electricity to the entire building
Various processing and construction application scenarios: mining, forest logging and processing, engineering construction, etc.
Scattered gas power stations-CNG power generation (Sichuan and Chongqing area)
Major gas power plants in operation in Sichuan and Chongqing
1. 35,000 cubic meters of LNG + 60,000 cubic meters of CNG (Qijiang, Chongqing) Power plant capacity: 1,500kW;
2. 100,000 cubic meters of LNG (Qijiang, Chongqing) Power plant capacity: 3,850kW;
3. 100,000 cubic meters of LNG (Hechuan, Chongqing) Power plant capacity: 4,000kW;
4. 100,000 cubic meters of LNG (Santai, Mianyang) Power plant capacity: 2,500kW;
5. 100,000 cubic meters of LNG (301, Zigong, Sichuan) Power plant capacity: 4,000kW;
6. 60,000 cubic meters of LNG (303, Zigong, Sichuan) Power plant capacity: 2,400kW;
7. 200,000 cubic meters of LNG (Jintang, Sichuan) Power plant capacity: 4,400kW;
8. 200,000 cubic meters of LNG (Yibin, Sichuan) Power plant capacity: 4,400kW;
9. 72,000 cubic meters of LNG (Ziyang, Sichuan) Power station capacity: 2500kW;
100,000 cubic meters of LNG (Zizhong, Sichuan) Power station capacity: 3300kW;
LNG liquefaction plant power station-100,000 cubic meters LNG (Yulin, Shaanxi)
Project configuration:
• 250kW gas generator sets × 15 sets
• Sinotruk T12 engines × 15 sets
LNG liquefaction plant power station-72,000 cubic meters of LNG (Ziyang, Sichuan)
Project configuration:
• 3 sets of 1000kW gas turbines
• 12 sets of Sinotruk T12 engines
Natural Gas Power Plant-Factory Power Generation Project (Export)
Project configuration:
• 2000kW gas units × 6 sets
• Huachai Deutz V12 engines × 24 sets
LNG liquefaction plant power station – 35,000 cubic meters of LNG + 60,000 cubic meters of CNG (Qijiang, Chongqing)
Project configuration:
• 1000kW gas unit × 1 set
• 500kW gas unit × 1 set
• Deutz V6 engine × 6 sets
4MW gas power plant-100,000 cubic meters LNG liquefaction plant (Sichuan Zigong 301)
Project configuration:
• 1000kW gas units × 4 sets
• Deutz V6 engines × 16 sets
4MW gas power plant-100,000 cubic meters LNG liquefaction plant (Hechuan, Chongqing)
Project configuration:
• 1000kW gas units × 4 sets
• Deutz V6 engines × 16 sets
3.85MW gas power plant-100,000 cubic meters LNG liquefaction plant (Qijiang, Chongqing)
Project configuration:
• 3 sets of 1100kW gas generator sets
• 1 set of 550kW gas generator sets
• 14 Deutz V6 engines
Drilling Rig Gas Power Station-5000m Drilling Rig (Songyuan Oilfield)
Project configuration:
• 1500kW gas unit × 1 set
• 1250kW gas unit × 1 set
• Deutz V6 engine × 11 sets
Drilling Rig Gas Power Station-7000m Drilling Rig (Songyuan Oilfield)
Project configuration:
• 1000kW gas units × 4 sets
• Deutz V6 engines × 16 sets
Drilling Rig Gas Power Station-5000m Drilling Rig (Songyuan Oilfield)
Project configuration:
• 3 sets of 1000kW gas generator sets
• 12 Deutz V6 engines
• 1000 cubic meter pressure reducing skid
• 2 sets of CNG tank trucks
Gas-fired combined heat and power applications
Gas-fired combined heat and power applications
3000kW gas power plant project
This project uses three sets of 1000kW gas-fired generator sets (container-type gas-fired generator sets) to form a network and provide continuous power supply for the production project.
4000kW gas power plant project
This project uses 4 sets of 1000kW gas-fired generator sets to form a network to provide continuous power supply for the production project.
2750kW gas main power station – drilling rig power supply
The project uses 2750kW gas generator set + variable frequency DC motor
This project uses one 1500kW and one 1250kW gas generator set, equipped with DC variable frequency motors to provide power for 50 drilling rig platforms.
500kW Gas-fired Main Power Station-CNG Factory
This project uses two 250kW gas generator sets to provide power for a CNG plant with a daily output of 30,000 cubic meters.
3500kW gas-fired main power station-LNG plant
This project uses 14 open-frame 250kW gas-fired generator sets to provide power for a 100,000 cubic meter LNG liquefaction plant.
3000kW gas-fired main power station – drilling rig power supply
This project uses a double-skid 3000kW gas generator set with a DC variable frequency motor to provide power for a 50 drilling rig platform.