Project configuration:
• 1000kW gas unit × 1 set
• Weichai Baudouin 16M33 engine × 1 set


Scattered gas power stations-CNG power generation (Sichuan and Chongqing area)
Major gas power plants in operation in Sichuan and Chongqing
1. 35,000 cubic meters of LNG + 60,000 cubic meters of CNG (Qijiang, Chongqing) Power plant capacity: 1,500kW;
2. 100,000 cubic meters of LNG (Qijiang, Chongqing) Power plant capacity: 3,850kW;
3. 100,000 cubic meters of LNG (Hechuan, Chongqing) Power plant capacity: 4,000kW;
4. 100,000 cubic meters of LNG (Santai, Mianyang) Power plant capacity: 2,500kW;
5. 100,000 cubic meters of LNG (301, Zigong, Sichuan) Power plant capacity: 4,000kW;
6. 60,000 cubic meters of LNG (303, Zigong, Sichuan) Power plant capacity: 2,400kW;
7. 200,000 cubic meters of LNG (Jintang, Sichuan) Power plant capacity: 4,400kW;
8. 200,000 cubic meters of LNG (Yibin, Sichuan) Power plant capacity: 4,400kW;
9. 72,000 cubic meters of LNG (Ziyang, Sichuan) Power station capacity: 2500kW;
100,000 cubic meters of LNG (Zizhong, Sichuan) Power station capacity: 3300kW;
Biogas Power Plant-Food Waste Power Generation (Wuhan, Hubei)
Project configuration:
• 250kW gas units × 4 sets
• Deutz V6 engines × 4 sets
Biogas Power Plant-Food Waste Power Generation (Wuhan, Hubei)
Project configuration:
• 250kW gas generator sets × 2 sets
• Sinotruk T12 engines × 2 sets